Thermal Performance
Calculate Range, Approach and heat rejection from operating conditions.
Open tool ↗
NUVA ENGINEERING
We install, maintain and repair cooling towers and water piping for factories and commercial buildings. If you’re dealing with a leak, vibration or warmer outlet water, tell us what has changed and we’ll help you decide what to check first.
Team experience · apparel digitally adapted
NEW VALUE IN ENGINEERING
We can help at each stage, from checking an existing cooling tower or pipe run to planning the repair and carrying out the work.
Get to know NUVA ↗OUR EXPERTISE
Cooling towers. Industrial piping.
One team to help you move forward.
ENGINEERING TOOLS
Start with an example or use readings from your site. You can attach the result when you ask us for a quote.
Calculate Range, Approach and heat rejection from operating conditions.
Open tool ↗Compare annual motor energy and simple payback at the same shaft load.
Open tool ↗Compare drift losses using your circulation rate and drift data.
Open tool ↗Select the system, material and symptom for a site inspection checklist.
Open tool ↗FIELD NOTES
DRIFT ELIMINATORS
Separate airflow restriction from droplet bypass before deciding whether to clean, repair or replace drift eliminators.
Read article ↗FAN CONDITION
Peeling material, exposed fibres and corroded connections need an assessment of the complete fan assembly.
Read article ↗
NOZZLES & FILL
Found a hole or a dip in the fill? Check the nozzle above it, how the water is discharged and what supports the fill before deciding what to replace.
Read article ↗THERMAL PERFORMANCE
Start by comparing load, water flow and entering wet-bulb temperature while recording which fans and cells are running.
Read article ↗FAN ENERGY
Start with the fan you already have. Check how much cooling the site needs and how much power the fan uses at the speeds it actually runs.
Read article ↗DRIFT & WATER
Note where and when you see the droplets. That gives you a starting point for checking the water distribution, drift eliminator and basin separately.
Read article ↗PIPING CONDITION
Locate the failure and check adjacent pipe. The fluid, pressure, temperature, supports and repair history help define how far the inspection should extend.
Read article ↗PRODUCTS & SPARE PARTS
Cooling tower FRP and mechanical spares, piping accessories and vibration isolators. We review your requirements and existing-system interfaces before quotation.
Illustrations show equipment types. Model selection depends on the specification and site conditions.
Confirm the connection type, flow rate and operating pressure.
Request a quoteFor fan assemblies or equipment designed for isolation from the supporting structure.
Explore spring isolatorsSPRING ISOLATOR
Spring mounts help reduce vibration transmitted from fan assemblies and machinery into the supporting structure. Selection depends on the operating load at each support, running speed and specified static deflection. Outdoor installations also need a review of wind loads and restraint requirements.
For a quotation, share photos of the existing base, number of supports, operating load per support if available and fixing dimensions.
Request a spring isolator quote
From the team’s previous site experience
01 / SUPPLY TO SPECIFICATION
Internal components, FRP parts, fans and drives, sourced to your model, dimensions, material and operating conditions.

From the team’s previous site experience
02 / SUPPLY TO SPECIFICATION
Pipework, valves, joints and water-system accessories. Size, connection standards and service conditions are checked before quotation.
Send specs / request a quote ↗Share the model, existing-part photos, dimensions, material and quantity. Model, source, availability, lead time and warranty terms are confirmed in each quotation.
ABOUT NUVA ENGINEERING
NEW VALUE IN ENGINEERING
NUVA Engineering surveys, installs, maintains and upgrades cooling towers and industrial piping. We use field observations and measurements to define the work around operating conditions and the available shutdown window.
Cooling tower services include installation, fill and drift eliminator replacement, performance assessment and airflow measurements. Piping services cover HDPE water systems, valves and connections.
We work with partners in the cooling tower industry to coordinate equipment sourcing and services to the specification and agreed scope of each project.
COMPANY PROFILE
Company overview, service scope and examples from the team’s field experience.
English · 6 pages · R01
Company registration no. 0105569185207
COOLING TOWER SYSTEMS
Installation, maintenance and upgrades for cooling towers. Internal components, fans, drives and site measurements help define the right scope for your operating conditions.

Cooling tower supply, site installation, fan assembly and drive components to agreed drawings and scope.
Replace fill, drift eliminators and nozzles, with structure, basin and FRP repairs based on site findings.
General inspection, thermal performance and airflow testing, with improvement options based on site data.
PIPING & WATER SYSTEMS
Installation, replacement and upgrades for water-system pipework. From routing and tie-ins to valves and supports, we plan around your site and shutdown window.

Review routes, sizes, materials and existing-system tie-ins, with installation and rerouting to project requirements.
Replace valves, flexible connectors, gaskets and flange assemblies after checking fluid and operating conditions.
Assess leaks, damaged components and supports, then define the work scope, acceptance checks and site schedule.
GENERAL INSPECTION
General cooling tower inspections assess accessible equipment for wear, damage, leakage and operating concerns. Deliverables can include an observation list, site photos and recommendations within the agreed scope.
Review blades, fastenings, gearboxes, shafts, belts and pulleys as applicable.
Inspect accessible fill, nozzles, drift eliminators, basins, structure and supports.
Review symptoms and maintenance history. Additional checks, such as current or vibration measurements, are included when agreed in the scope.
PERFORMANCE ASSESSMENT
Agree measurement points, instruments, duration and test conditions before work begins, so the findings answer the project’s actual questions.
Hot-water inlet − cold-water outlet temperature
Cold-water outlet − entering-air wet-bulb temperature
Calculated from water flow and temperature difference
Actual power measurement (kW) within the agreed scope
Agree the method, measurement points, instruments and assessment criteria before testing. Before-and-after comparisons consider load, flow, weather and controls. Airflow testing alone does not establish thermal performance. Site reports are not third-party certification unless included in the agreement.
CONNECTED ENGINEERING SERVICES
Field assembly and installation or replacement of fans, gearboxes and drive components to agreed drawings and scope.
Fill, drift eliminators, nozzles, fans, motors, gearboxes, belts and shafts, subject to compatibility review.
HDPE and water-system pipe installation and replacement, valves, fittings, supports and fabrication within the agreed project scope.
Condition review of fans, drives, belts, fill, nozzles, basins and structure, with findings and maintenance recommendations.
Repairs to damaged structure, equipment supports, basins and FRP lining based on site findings.
Multi-manufacturer equipment sourcing with delivery, installation and handover within one agreed scope.



Illustrative equipment visuals. Models, materials, dimensions and performance depend on manufacturer selection and project specifications.
Unsure whether to repair, replace or upgrade? We can review your information and arrange an on-site assessment to understand the issue, practical options and system constraints. Site access, visit timing and survey details are agreed together.
TWO CORE SERVICES
01 / SERVICE
If the outlet water is warmer, the airflow is uneven, the fan vibrates or more droplets are escaping, we check what has changed before recommending work.
02 / SERVICE
Rust, a slow leak or repeated repairs? We check the pipe, valves, flexible joints and supports before recommending a local repair or a section replacement.
SITE PROBLEMS / ENGINEERING SUPPORT
Share the symptoms and site photos. We help define what to inspect, compare options and plan around your shutdown window.

Inspect the casing, basin, supports, internals and operating performance to compare repair, refurbishment and replacement.
Prepare photos, nameplate, repair history and operating temperatures.
See inspection and service options
Inspect deposits, erosion, cracks, blade roots and hub condition. Review pitch, tip clearance and vibration with RPM. Consider coating when the material, condition and manufacturer’s repair criteria support it.
Structural damage requires a review of the repair limits or blade replacement.
See inspection and service options
Locate the defect, check adjacent pipe and supports, and consider UT thickness measurements for metallic pipe where suitable. Use the findings to scope local repairs or section replacement.
Share pipe size, material, service conditions and your shutdown window.
See inspection and service options
Inspect the joint, flange faces, bolts, alignment and nearby supports. Confirm face-to-face length, flange drilling, pressure, temperature and required movement before selecting a replacement.
Plan isolation, draining, replacement and leak testing around the shutdown window.
Request a joint survey ↗
Check deposits, blockage, brittleness, pack deformation and supports alongside water distribution and operating temperatures. Compare cleaning with replacement using findings from the site.
Choose fill type and material for water quality, temperature, airflow and structural capacity.
See fill inspection ↗
Assess existing decking, beams, connections and access needs. Consider FRP grating for walkways and suitable FRP structural members where the engineering design supports the change.
Check design loads, span, deflection, fixings and the remaining supports before specifying replacement.
Explore retrofit options ↗Photos show visible condition. Repair and replacement recommendations follow inspection and operating data.
Include equipment type, symptoms, location and available shutdown dates.
STRUCTURAL REPAIR & REPLACEMENT
NUVA undertakes surveys, repair planning, component replacement and installation for cooling tower structures, coordinated with mechanical and piping work.


Inspect material loss, connections and foundations. Define local repair or member replacement from the assessment.
Review supports and maintenance access; compare suitable steel or FRP products under an engineering design.
Specify surface preparation and protective coating for suitable repairable members. Plan temporary supports, dismantling and installation around shutdown constraints.
These are existing-condition photos, not completed structural repair examples. Repair scope and material selection require inspection and an engineering assessment. Coating does not restore lost structural section.
Request a structural site survey ↗
COOLING TOWER / STRUCTURAL RETROFIT
Review the whole load path before changing materials. The scope may include walkway grating, deck panels, fill supports, beams, connections and local basin repairs.
FRP is an option for assessment. Photos do not establish structural capacity or confirm fitness for continued operation.
Discuss a tower retrofit ↗Product and design reference: Strongwell · Cooling Towers · DURAGRATE load tables (PDF)
FIELD EXPERIENCE
Our team’s field experience informs how we plan access, assembly and component replacement for each site.



Photos from the team’s previous work, edited for presentation.
NUVA PROJECT REFERENCES & TEAM EXPERIENCE

NUVA PROJECT · INSTALLATION COMPLETED
Cooling Tower InstallationInstallation subcontract works by NUVA Engineering for a Truwater cooling tower at the OATSIDE plant, Chonburi, Thailand.
Basin, structure, fill and mechanical assembly within the agreed installation scope.

Team field experience
Industrial Piping SystemsPipe routing, elbows and flanged connections.

Team field experience
Industrial Piping SystemsHDPE pipe assemblies, fittings and supports in a water-system area.

Team field experience
Cooling Tower SolutionsPrior work by our team: fan, gearbox and supporting components. Photo retouched for presentation.

Team field experience
Cooling Tower SolutionsLifting and installation work within an industrial structure.

Team field experience
Maintenance & RepairTypical inspection points: belt condition, pulleys and drive supports.

Team field experience
Engineering & Performance TestingCondition review of water distribution components, deposits and tower fill.
Photos show prior work and field experience of our team; not every project was contracted under NUVA. The fan assembly photo is retouched for presentation.
HOW WE WORK
Discuss concerns, arrange a site visit and collect information to the agreed assessment scope.
Agree options, scope, acceptance checks and shutdown availability.
Coordinate materials, site resources and safety requirements.
Complete agreed checks and provide findings and care recommendations.
RFQ / CONTACT NUVA SALES
Contact NUVA Sales with your project requirements. Share the work type and site details so we can assess the scope and arrange the next step.
LET’S DISCUSS YOUR PROJECT
Send site photos, current concerns and the project location through LINE for an initial discussion. We can arrange a site visit to assess the work. For pipes and valves, include sizes, materials, service fluid and shutdown availability. For cooling towers, share nameplate details and available operating data.
Discuss your project on LINE ↗CONTACT NUVA ENGINEERING
NUVA Engineering Co., Ltd.
Bangkok, Thailand
Scan to add us on LINE